Skip to content
Small gravel aggregate close-up
Landscaping

How Much Gravel for a 100-Foot Driveway?

See cubic-yard estimates for a 100-by-12-foot driveway at three gravel depths, with a separate check for tons and compaction.

▦  ◷  2 min readBy Our review process
Photo: Philippa Lowe / Unsplash
Calculation at a glance

The formula

Cubic yards = Length × Width × Depth (in) ÷ 12 ÷ 27Calculate each aggregate course independently.
  • A 100 × 12 ft driveway covers 1,200 ft².
  • Planned depth must reflect the prepared base.
  • Tons require the exact aggregate density.

Worked example

Estimate one 4 in gravel layer on a 100 ft × 12 ft driveway.

  1. Find area

    100 × 12 = 1,200 ft².

  2. Find cubic feet

    1,200 × (4 ÷ 12) = 400 ft³.

  3. Convert to yards

    400 ÷ 27 = 14.81 yd³.

100 ft12 ft4 in
Schematic illustration; not to scale.Example result14.81 yd³Clean geometric volume before allowance.

Practical guide

A 100 ft long, 12 ft wide driveway covers 1,200 ft². The amount of gravel depends on the depth of each layer; length alone cannot tell you the order. Multiply length × width × depth in feet to get cubic feet, then divide by 27 for cubic yards.

Planned gravel depth Cubic feet Cubic yards
2 in 200 7.41
4 in 400 14.81
6 in 600 22.22

At 4 in, the arithmetic is 100 × 12 × (4 ÷ 12) = 400 ft³, or 14.81 yd³. The table gives clean geometric volumes. It does not prescribe a driveway section: vehicle loads, subgrade, drainage, aggregate type and local practice determine the layer design. A driveway with separate subbase and surface courses needs a takeoff for each material, even if their combined depth is 6 in.

From yards to a supplier order

Some suppliers sell by cubic yard, others by ton. There is no reliable universal yards-to-tons factor because aggregate density, grading and moisture vary. Ask the supplier for the bulk density of the exact gravel. If it quotes 1.4 short tons per cubic yard as an illustration, the 4 in scenario would be about 20.7 short tons; a different product density changes that figure. Verify whether quoted quantity is loose delivery volume or compacted coverage.

Check several depths after excavation. If one section needs 3 in and another 5 in, calculate those rectangles separately and add them. Account for a chosen ordering allowance or compaction expectation explicitly, so you can see why the purchase differs from 14.81 yd³. The existing gravel depth guide explains the unit conversion for smaller areas; the Gravel Calculator accepts the dimensions and supplier density for this driveway.

Before you order

Measure the width

Use the actual prepared dimensions.

Split courses

Base and surface aggregate may differ.

Check compaction

Confirm loose versus compacted quantity.

Get density

Use supplier data for tonnage.

Check your own measurements

Estimate gravel volume for a measured area.

Open Gravel Calculator
Use this as a quantity estimate.

Check the selected product, site measurements, and local requirements before ordering. Read our calculation methodology and limits, or report a correction.

Questions & answers

Frequently Asked Questions

Common questions about the Gravel Calculator.

Why can the estimated tons change while cubic yards stay the same?
Weight depends on bulk density. The geometric volume is determined only by dimensions and waste.
Does this include compaction?
No. Enter the installed depth you need and consult the supplier about compaction or settlement for the selected material.