Carpentry & measurement calculator

Cubic Yard Calculator

Convert the length, width, and depth of a rectangular construction area into a volume you can use with a material supplier. The tool also shows a rounded order amount when you add an allowance.

✓   Clear calculations✓   No account required✓   Free to use
Bulk soil pile beside construction equipmentMeasure your project
Check the result ↗

Project dimensions

Enter your project measurements.
ft
ft
in
%
$
Enter prices in the selected currency. Changing currency does not convert the prices you entered.

Your measurements are calculated in this browser and are not sent to a server.

Measurement guide

Measure the filled space

Measure the finished fill area and installed depth. The depth is the material layer, not the excavation beneath it.

Before calculating

Use the depth of material you will actually place. Convert depth to the same length unit as the footprint and exclude spaces that will remain empty.

Your measurements
Length 12 ftWidth 10 ftLayer depth 3 in
LengthDepthWidth

Your results

Estimated material quantity for your project.

✓ Calculation complete
Measured fill volume12 ft × 10 ft · depth 3 in
Live 3D

Drag to rotate or choose an angle. Repeated materials are limited in the model; measurements and estimate use your full values.

Calculated requirement
1.11yd³
Measured rectangular project volume
Recommended purchase
Plan 1.2 yd³

0% allowance; volume rounded up to 0.1 yd³.

How this estimate was calculated

Footprint area120 ft²
Installed depth3 in
Measured volume before waste30 ft³ · 0.85 m³
Volume after waste1.11 yd³ · 0.85 m³
Bulk volume planning amount1.2 yd³

Rectangular volume only. Adjust waste for your material; the tenth-unit order amount is for planning, not a supplier minimum.

Need help with your project?Check the method, assumptions, and related calculators below.
Explore all calculators →

How to use this calculator

  1. Measure the length and width of the area to fill or excavate.
  2. Enter the intended material depth. Use the unit shown beside the field; inches and centimeters are available for shallow layers.
  3. Leave the allowance at zero for pure volume, or add a project-specific percentage before planning the order.

Measure the project correctly

Measure inside containment edges or forms for fill volume. An outside-to-outside measurement can overstate the amount.

Average depth can hide major dips. For uneven sites, divide the area into sections with similar depths, calculate each, and sum the unrounded volumes before placing an order.

Bulk soil pile beside construction equipment
Bulk soil pile beside construction equipment. Photo: Julia Mitchell / Unsplash

The calculation

Cubic feet = length (ft) × width (ft) × depth (ft). Cubic yards = cubic feet ÷ 27. Order target = volume × (1 + allowance ÷ 100).

The same geometric calculation is used internally by material estimators on this site. Metric dimensions are calculated in meters; 1 m³ is about 1.308 yd³.

The displayed order amount rounds upward to 0.1 yd³ or 0.1 m³. That is a planning increment, not a claim about a supplier’s minimum order.

Worked example

A rectangular 12 ft by 10 ft area needs a 3 in layer. Start with no allowance and assume a material price of $50 per cubic yard.

Step-by-step Cubic Yard Calculator worked example
StepCalculationResult
Convert depth3 in ÷ 120.25 ft
Find cubic feet12 × 10 × 0.2530 ft³
Convert to yards30 ÷ 271.11 yd³
Plan orderRound 1.111 up to 0.1 yd³1.2 yd³
Price material1.2 × $50$60

The exact rectangular volume is 1.11 yd³; 1.2 yd³ is a practical tenth-unit order figure. If you add waste, the rounding happens after the allowance.

How to read the result

Measured volume
Dimensions multiplied without a material allowance.
Unit conversions
The same raw volume shown in cubic feet, cubic yards, and cubic meters.
Order amount
The allowance-adjusted volume rounded upward to a tenth.

Before you buy materials

Use Concrete for a pour-specific estimate, or Gravel when an approximate weight is also useful.

A material sold by the ton needs a density or supplier conversion; cubic yards alone do not establish tonnage.

When adding several sections, combine exact volume before rounding to avoid accumulating unnecessary tenths.

Common estimating mistakes

  • Forgetting to convert inches to feet: Use the depth input unit or enter a full value such as 3 in.
  • Assuming volume equals weight: Material density is needed for a weight estimate.
  • Rounding each segment independently: Add exact segment volumes, then apply allowance and purchase rounding once.

Assumptions and limits

  • One rectangular prism with constant depth; slopes and irregular cross sections are not modeled.
  • Material-specific expansion, settlement, compaction, density, delivery charges, and labor are excluded.
Questions & answers

Frequently Asked Questions

Common questions about the Cubic Yard Calculator.

How many cubic feet are in a cubic yard?
Exactly 27 cubic feet. The calculator displays both units from the entered dimensions.
Can I calculate excavation instead of fill?
Yes for a rectangular excavation. This gives geometric bank volume only; hauling or loose-volume swell is material specific.