The formula

Layer volume (ft³) = 144 × Layer depth (in) ÷ 12The example base depth is a quantity assumption, not a design standard.
  • The patio surface is 144 ft².
  • The base is aggregate beneath the bedding.
  • Joint sand between pavers is a third item.

Worked example

Calculate a 4 in base and 1 in bedding layer for a 12 × 12 ft patio.

  1. Measure surface

    12 × 12 = 144 ft².

  2. Calculate base

    144 × (4 ÷ 12) = 48 ft³ = 1.78 yd³.

  3. Calculate bedding

    144 × (1 ÷ 12) = 12 ft³ = 0.44 yd³.

12 ft12 ft1 in sand
Schematic illustration; not to scale.Example result0.44 yd³ sandPlus 1.78 yd³ example aggregate base.

Practical guide

A 12 × 12 ft patio covers 144 ft². At an illustrative 1 in bedding sand layer, the sand volume is 12 ft³, or 0.44 yd³. At an illustrative 4 in aggregate base, the base volume is 48 ft³, or 1.78 yd³. These are separate materials and separate orders.

Layer Example depth Clean volume Cubic yards
Aggregate base 4 in 48 ft³ 1.78 yd³
Bedding sand 1 in 12 ft³ 0.44 yd³

For either line, calculate 144 × (depth in inches ÷ 12). If your bedding sand is sold in 0.5 ft³ bags, the clean 12 ft³ amount is 24 bags. Check the labeled bag volume and round after any allowance your job requires. If the base is sold by ton, ask the supplier for this aggregate’s bulk density; do not equate 1.78 cubic yards with 1.78 tons.

Keep the layers distinct

The Concrete Masonry & Hardscapes Association’s paving specification describes a nominal 1 in screeded bedding layer and advises against filling depressions in the base with bedding sand. The 4 in base in this example is only a takeoff assumption. Actual base material and compacted thickness depend on the subgrade, drainage, loading, climate and the chosen paver system. Measure from the prepared excavation to the planned finish elevation and follow the project design.

Joint sand that fills gaps between pavers is a third quantity. Its amount depends on paver shape, thickness and joint width; do not add it to the 12 ft³ bedding figure. The Paver Sand Calculator checks bedding area and depth. Our base versus bedding guide explains each layer’s role, and the paver count guide handles the units on top.

Before you order

Specify each layer

Do not combine gravel and sand.

Confirm base design

Depth depends on site and use.

Check bag volume

0.5 ft³ bags mean 24 clean-volume bags.

Measure joint fill

Calculate it separately.

Check your own measurements

Plan bedding sand beneath a measured paver area.

Open Paver Sand Calculator
Use this as a quantity estimate.

Check the selected product, site measurements, and local requirements before ordering. Read our calculation methodology and limits, or report a correction.

Questions & answers

Frequently Asked Questions

Common questions about the Paver Sand Calculator.

Is this polymeric sand for paver joints?
No. It estimates bedding sand under the pavers; jointing sand is a different material and application.
Why is density editable?
Sand moisture and gradation change mass per volume, so the weight figure should match your supplier’s product.